Architecture Feedback Intelligence

Turn client opinions into
measurable design intelligence

Post-occupancy surveys, design preference polls, and stakeholder feedback loops — built for project architects, facilities managers, and urban planners.

Live Estimator

Survey Cost & Response Calculator

Adjust inputs — numbers update in real time

AIA-Aligned
45
5200
Response Rate
76%
Expected Responses
34
±12% margin
Avg. Completion
9min
Good range
Cost / Insight
$1.19
High quality

Template Directory

80+ AIA-aligned survey templates

Browse all
Post-Occupancy Core
14Q·2,847 uses
Post-Occupancy
LEED IEQ Feedback
9Q·1,203 uses
Post-Occupancy
Schematic Preference Poll
7Q·986 uses
Schematic
Healthcare Wayfinding
11Q·754 uses
Post-Occupancy
Campus Renovation Brief
18Q·641 uses
Schematic
Thermal Comfort Audit
6Q·1,892 uses
Post-Occupancy

Response Heatmap

Satisfaction scores by zone · Post-Occupancy

n=247
87%Lobby
62%Open Office
91%
78%
45%Collab Zone
94%
71%Focus Pods
83%Reception
55%
88%
85–100%
70–84%
55–69%
<55%

Response Rate Benchmarks

Survey platform vs. industry average

Post-Occupancy
avg 68%82%
Schematic Design
avg 55%74%
Healthcare
avg 61%78%
Education
avg 58%71%

Closing the loop — telling respondents "You said X, we did Y" — raises rates by 4–6 percentage points. Survey automates this follow-up.

Post-Occupancy Surveys·AIA Phase Templates·Revit Integration·LEED IEQ Documentation·BIM 360 Connected·Response Rate Analytics·Stakeholder Feedback Loops·80+ Ready Templates·Post-Occupancy Surveys·AIA Phase Templates·Revit Integration·LEED IEQ Documentation·BIM 360 Connected·Response Rate Analytics·Stakeholder Feedback Loops·80+ Ready Templates·

BIM Integration

Three steps to connected feedback

01Connect your BIM model

Link Revit or BIM 360 project files. Survey extracts zone names, program areas, and occupant counts automatically.

02Map spaces to questions

Drag survey questions onto floor plan zones. Responses are geo-tagged to specific rooms and program areas.

03Export insight reports

Receive structured reports formatted for AIA deliverables, LEED documentation, and client presentations.

SOC 2 Type II certified · ISO 27001 · GDPR compliant

The gap most firms aren't filling

Despite years working closely with clients, most architects never conduct formal post-occupancy evaluation. UC Berkeley's CBE database has 1,200+ projects — yet the average firm has zero. Survey closes that gap in hours, not months.

2hrs
To prepare, distribute & review a basic POE survey
vs. weeks of email coordination
100K+
Individual responses in our benchmark database
Compare your project against real-world data

Trusted by Architecture Firms

The firms that listen, win.

11,200+
Surveys Deployed
247K
Responses Collected
82%
Avg. Response Rate
4.8min
Avg. Completion

"We replaced 3 months of contradictory client email threads with a single post-occupancy survey. The heatmap alone justified our renovation budget."

SC
Sarah Chen, AIA
Perkins Eastman

"The Revit integration means our space data and occupant feedback live in the same workflow. That's never existed before in architecture."

MW
Marcus Webb
Gensler Chicago

"Post-occupancy was always the thing we knew we should do and never did. Survey made it a 2-hour task instead of a 2-month project."

PN
Priya Nair, LEED AP
HOK New York
Perkins EastmanGenslerHOKSOMSkidmoreZGFHKSStantecPerkins EastmanGenslerHOKSOMSkidmoreZGFHKSStantec
Freemium — No Credit Card

Stop guessing what your
building users actually think.

Launch your first post-occupancy survey in under 15 minutes. Work email and firm name — that's all we need.

Browse 80+ Templates

Free forever for <3 surveys/month · Used by Perkins Eastman, Gensler, HOK, and 400+ AEC firms

Ready to replace email chaos with structured insight?Free forever · No credit card · Work email only
Browse 80+ Templates